The Rudi Khola Hydropower Project generally refers to the cascade development of Rudi Khola-A and Rudi Khola-B on Rudi Khola, near the Kaski–Lamjung border. Together, the two projects have an installed capacity of about 15.4 MW and are operated as run-of-river hydropower projects. The electricity generated is supplied to Nepal’s national grid.
Ask a Question
Send your question and we will get back to you by email.
Get a Quote
Share your product requirements and our marketing team will respond with pricing details.
Work out the monthly instalment for a purchase or project loan using the standard reducing-balance formula.
Result
Monthly EMI
—
Total Interest
—
Total Payment
—
Number of Instalments
—
Indicative figures only. Your lender may add processing fees, taxes, or insurance.
Pick a profile, enter the section dimensions, and get the weight per meter, per piece, and for the whole order.
Result
Weight per meter
—
Weight per piece
—
Total weight
—
Weights are calculated from the nominal geometry and exclude root radii, tapers, and rolling tolerances.
Circular cross-section weight for rebar, bright bar, and round stock.
Result
Weight per meter
—
Weight per piece
—
Total weight
—
Cross-section area = pi / 4 x diameter squared.
Equal and unequal angle weight from the two leg sizes and the leg thickness.
Result
Weight per meter
—
Weight per piece
—
Total weight
—
Cross-section area = thickness x (leg A + leg B - thickness). Root radii are ignored.
Approximate weight for C and U channels from the web and flange dimensions.
Result
Weight per meter
—
Weight per piece
—
Total weight
—
Cross-section area = web + two flanges. Root radii and flange tapers are ignored, so rolled-section tables may differ slightly.
Convert length, weight, area, and volume units used on site. Results update as you type.